Dry the physical mechanical performance of fly ash ceramsite showed that within 1 hour of fly ash ceramsite bibulous rate is growing rapidly, especially the alarming bibulous rate of 10 minutes, 1 hour after the bibulous rate is gradually slow growth, 24 hours almost no longer increases, namely the bibulous rate of ceramsite 1 day close to saturated water absorption.
The Maintains and Examine Repair of Rod Mill
1) All the lubes should change once a month, and in the future, according to the repair and examine change the lube once per six month.
2) Every lubricant part and the surface height of the oil should be examined once per four hours.
3) When the mill works normally, the temperature of lube that in the main bearing is no more than 55℃.
4) If the mill works normally, the temperature of driving bearing and reducer is no more than 55℃, the highest is 60℃.
5) The big and small gear wheel drive evenly, no noises. If necessary, should adjust the gap in time.
6) The rod mill rotaries evenly, no strong shake.
7) The electricity of the motor should be provided evenly.
8) Each connected tighten parts are no loosen, no oil and material leaks.
9) The quantity of adding steel rod depends on the fray case.
10) If found the deviant thing, it should stop work and repair at once. The maintains of the mill is a piece of regular work, the effect of the maintains can affect the rotary rate and its life. In order to find the fault in time and make the mill work normally, except the maintains daily, need to fix a date to stop milling(advise once per month) and examine the medium-altitude bearing, main bearing, tube, reducer, big and small gear wheel etc carefully, make the notes details. According to different faults, arranging the repair work.
stone jaw crusher: http://www.hxjqcrusher.com/crusher/Stone-jaw-crusher.html
The Maintains and Examine Repair of Rod Mill
1) All the lubes should change once a month, and in the future, according to the repair and examine change the lube once per six month.
2) Every lubricant part and the surface height of the oil should be examined once per four hours.
3) When the mill works normally, the temperature of lube that in the main bearing is no more than 55℃.
4) If the mill works normally, the temperature of driving bearing and reducer is no more than 55℃, the highest is 60℃.
5) The big and small gear wheel drive evenly, no noises. If necessary, should adjust the gap in time.
6) The rod mill rotaries evenly, no strong shake.
7) The electricity of the motor should be provided evenly.
8) Each connected tighten parts are no loosen, no oil and material leaks.
9) The quantity of adding steel rod depends on the fray case.
10) If found the deviant thing, it should stop work and repair at once. The maintains of the mill is a piece of regular work, the effect of the maintains can affect the rotary rate and its life. In order to find the fault in time and make the mill work normally, except the maintains daily, need to fix a date to stop milling(advise once per month) and examine the medium-altitude bearing, main bearing, tube, reducer, big and small gear wheel etc carefully, make the notes details. According to different faults, arranging the repair work.